28/06 After trig hell in producing calculations for correct tube lenghts for LA and LB cut a section with correct angles on one end then repeated cut at 321mm up the tube to produce section of nearly the correct size, finishing off with rough file was all that was needed to get the tube to fit.
27/06 begin with cutting uprights marked H (nae problem whatsoever)However started cutting lenghts for front section (LA -LD) The book seems to be incorrect with its cutting lengths for LA and LB as when profiled and offered up the assembly was going to have incorrect dimensions.
Thankfully the sections cut can be used elsewhere.
Blog Archive
-
▼
2009
(22)
-
▼
November
(22)
- Well That's all I could recover
- Wishbone Ash it
- Minor Problems
- The Sun came out
- “Been a long time since I wrote some scroll”
- Body Work
- Axle Blast
- Lady of the River
- Welding Done
- Stage 2 Complete
- Stage 2 almost complete
- Beezer
- Eureka
- Another Lost weekend
- Slow Progress
- Let There Be Height
- Stage 2
- Stage 1
- Tubes
- Where did the time go
- Awaiting Steel Delivery
- Info
-
▼
November
(22)