The chassis is comming along nicely with the transmission tunnel complete and is now in a state where the next stage is to fuly weld the whole chassis together. This is a big step as I’m a bit apprehensive about doing this as things can go real pear shaped at this satge, although having taken advice from a number of sources I’m goint to procede with this next week.
Since the photo below was taken, the panhard rod support tube Z, the final two H tubes at the front of the tunnel and the engine support tubes G1 and G2 have all been added